StoneWork Quiz

Objective: answer 7 questions correctly. JavaScript required!


1. WARM-UP: Evenly coursed stonework is called ?

Rubble
Dry Laid
Ashlar
Flat Course

2. "Pointing" is ?

The re-packing of joints.
Sharping of trowel.
Showing where the stones are.
Leading in direction.

3. Mortar for stonework should be ?

Very wet.
Damp
Dry
Hard

4.Sandstone cuts like ?

Butter
Cinder Block
Glass
Wood

5. Veneer stonework is ?

Very Old
Thick
Low
Thin

6. Very Large stones are suited for

the top
back fill
the base
a walkway

7. Pick out the cornners from the pile

while the stone is on the truck
when you need one
first thing
it's not required

8. Vertical joints should run

forever
not more then 6 courses
not more then 2 courses
1/2 hour

9. Rubble stonework is

a bad stone job.
thick walls.
very small stones
ramdon orded

10. A pointing trowel is used for

Re-packing of joints
Showing directions
Sticking the Pig
Simulation