Objective: answer 7 questions correctly. JavaScript required!
JavaScript is disabled. Get Netscape 3.0 or turn it on!
Rubble Dry Laid Ashlar Flat Course
2. "Pointing" is ?
The re-packing of joints. Sharping of trowel. Showing where the stones are. Leading in direction.
3. Mortar for stonework should be ?
Very wet. Damp Dry Hard
4.Sandstone cuts like ?
Butter Cinder Block Glass Wood
5. Veneer stonework is ?
Very Old Thick Low Thin
6. Very Large stones are suited for
the top back fill the base a walkway
7. Pick out the cornners from the pile
while the stone is on the truck when you need one first thing it's not required
8. Vertical joints should run
forever not more then 6 courses not more then 2 courses 1/2 hour
9. Rubble stonework is
a bad stone job. thick walls. very small stones ramdon orded
10. A pointing trowel is used for
Re-packing of joints Showing directions Sticking the Pig Simulation